Panel and component count
Give an approximate count and identify any related equipment that needs to be considered in the scope.
A post-removal collection workflow for Sydney solar installers and electricians: reduce double handling, confirm access and choose the right collection scope.

For a Sydney installation or replacement job, ReSova can collect eligible solar panels and related equipment after they have been safely removed and staged at ground level. To scope the collection, provide the count, broad condition, site contact and loading access. This keeps collection separate from electrical work and does not promise a reuse, recycling, price or arrival-time outcome.
Give an approximate count and identify any related equipment that needs to be considered in the scope.
Describe intact, damaged, shattered, fire-affected or mixed equipment accurately so the collection can be assessed properly.
Note the ground staging point, parking/loading constraints, gate or induction requirements and one contact who can confirm the handover.
A removed batch can become a second logistics job: unload it from the van, find temporary space, reload it and make a separate disposal run. ReSova's role is to scope an on-site collection handover once the electrical and removal scope is complete — not to diagnose the system or take responsibility for the removal work.
These are practical collection inputs. They do not replace electrical, safety, contractual or legal obligations that may apply to a particular site.

| Job context | Collection preparation | Scope route |
|---|---|---|
| Eligible 10–69 panel job | Panels are safely removed, count is known and standard access is available. | Use the collection estimator for an indicative standard route. |
| 70+ panels or a mixed system | Include components, batch condition and project-access details. | Request a tailored commercial scope. |
| Complex access / multi-site work | Provide the staged location, contact and each access constraint. | Use a tailored scope; do not treat an online estimate as the full plan. |
Complete electrical isolation and safe removal through the appropriately qualified team.
Place removed equipment at an accessible ground-level handover point, away from active work and vehicle routes.
Record count, broad condition, components, address and access constraints.
Use the estimator where eligible, or request a commercial tailored scope.
ReSova counts eligible items at collection and records the handover on a job docket.
For 70+ panels, complex access or mixed equipment, request a tailored commercial scope instead.