Safe removal first
Do not attempt electrical isolation or roof removal for collection purposes. Have the appropriate qualified people complete that work.
Understand how to prepare removed solar panels for collection in Sydney: safe removal first, count, visible condition, ground staging and access details.

ReSova can scope collection for eligible solar panels once they have been safely removed by qualified people and are ready for a ground-level handover in Sydney or selected NSW areas. A panel-only request needs a count, broad visible condition, staging location and vehicle-access details. The collection does not guarantee a recycling rate, reuse outcome, price, time or named receiving facility.
Do not attempt electrical isolation or roof removal for collection purposes. Have the appropriate qualified people complete that work.
Give the approximate panel count and broad visible condition; disclose damage or any special handling context.
Keep the batch at a protected, accessible ground-level location and explain the vehicle/loading route.
A solar panel can look intact, cracked or mixed with other equipment, but collection planning should not guess the downstream result from appearance alone. The useful first distinction is whether the panel has been safely removed, can be counted and can be handed over without re-entering a roof or live electrical work area.
These are practical collection inputs. They do not replace electrical, safety, contractual or legal obligations that may apply to a particular site.

| Panel context | What to provide | What not to assume |
|---|---|---|
| Intact-looking removed panels | Count, broad condition and accessible staging location. | That they will be reused or accepted into a particular pathway. |
| Damaged or mixed panels | Describe the visible condition and any access / containment constraint before booking. | That all damage has the same handling or downstream route. |
| Large or complex batch | Panel count, site access, related components and the project contact. | That a standard online pathway covers every project. |
Qualified people disconnect and remove the panels before collection is considered.
Record an approximate number of panels and broad visible condition.
Use an accessible, protected point that does not rely on roof work or live electrical access.
10–69 eligible panels can follow the online estimate path; 70+ or complex work requires a tailored scope.
Eligible panels are counted at handover and recorded on a job docket.
If the job includes 70+ panels, special access or mixed equipment, request a tailored scope.